FINISHED PROJECT
Project at Hacom Energy Bac Lieu
Cong Tien has signed a contract with the Investor, Hacom Bac Lieu Energy Joint Stock Company for the mechanical and electrical erection of 13 wind power generator turbines at Hoa Binh 5 Wind Power Plant (phase I) in Vinh Moi hamlet, Vinh Thinh commune, Hoa Binh district, Bac Lieu province. Currently, the project has been completed and the factory is expected to run COD in October 2021.
Some pictures during construction

Installation of 1st tower section

Installation of 2st tower section

Installation of 3st tower section
Installation of 4st tower section
Installation of 5st tower section

Installation of 6st tower section
Installation of Nacelle
Wing blade combination at the ground
Install Hub Connection with Nacelle
CTTi Team at the Project